Minutes of Prudential Committee Meeting
Jericho Fire District No. 1
April 19, 2016
Attendees: Fred Lavenberg, Ann Kroll Lerner, Brian Stevens, Les Allen, Dan Dube
Brian presented our current, Operating Income and Cash Flows with 2016 revenues of $22,440 (see attachment). This does not include all of the 2nd quarter assessments. One more deposit of late receipts is outstanding.
Current cash balance is $28,033 with most operation cost on target. We are under budget for snow removal and we expect, by YE, to be over budget for sludge removal.
Les, acting as the interim, 2nd qtr. Bill collector, reported that all payments were received but the one from the abandoned house on Arcadia Circle. He also reported that twelve payments were received at varying times past the due date.
The faulty curb stop at #2 Ridge Rd. was discussed. According to our system operator, the fault was a bent pipe, into which the valve wrench is inserted to actuate the valve. This curb stop pipe, like some others, sticks up above the lawn where it is exposed to accidental bending when hit by lawn mowers or other items. In this incident, the water was shut off at the entrance to Ridge Rd (affecting nine homes) while the leak within the residence was fixed. Our system operator has offered to determine an average cost for repairing such a pipe so as to eliminate the pipe’s risk of future bending and/or correcting existing bent pipes. Our operator will also survey how many, if any other curb stops have similar bent access pipes. When these numbers are known, the PC will consider what action to take.
The PC approved the summer maintenance plan proposed by our system operator. This includes:
- A Spring flushing of the distribution lines.
- Cleaning and inspecting cell B of the two reservoir cells.
Les explained the events of our most recent sludge removal. This is a pump-out by our usual contractor P&P Septic. This time we were careful to pre-pump some of the clean water (resulting from the settling action within the holding tank) in order to ensure a single truck load (4,000 gal.) was not exceeded. However, the bill exceeded our expectations based on several previous billings. Discussions with P&P Septic did not explain the low prior bills but did explain the current billing methodology. We can expect a yearly cost for sludge pump out to be a minimum of $3,240.
Dan Dube, our new web master, showed us the work that he has accomplished with a revised web site and explained some of the differences. This web site is based in Google where-as the prior site was based in Yahoo. The location, jerichofoothills.org remains the same. The PC approved for Dan to proceed, in particular to install all of the known members (Foothills Residents) e-mail addresses. There will be an option for members to opt out, but starting with all in is easier and more efficient than offering a sign-up procedure. We are excited by what Dan has accomplished and thank him for his service.
Also, to our delight, two members offered to be bill collectors for our water system. These are; Sue Grab and Robert Nadal. It has been discussed, to split the tasks in a similar way that Debbie Lackey and Dawn Makowenskyi had done. Mac Lippert will assist this transition prior to the 3 rd quarter billing. We thank Sue and Robert for this generous offer to assist our operations.
Respectfully submitted
Les Allen, Clerk, JFD#1